SS United States

United States romano pisciotti manager
United States

 

SS United States is a luxury passenger liner built in 1952 for United States Lines designed to capture the trans-Atlantic speed record.

Built at a cost of $78 million, the ship is the largest ocean liner constructed entirely in the US, the fastest ocean liner to cross the Atlantic in either direction, and even in her retirement retains the Blue Riband given to the passenger liner crossing the Atlantic Ocean in regular service with the record highest speed.

Her construction was subsidized by the US government, since she was designed to allow conversion to a troop carrier should the need arise. United States operated uninterrupted in transatlantic passenger service until 1969. Since 1996 she has been docked at Pier 82 on the Delaware River in Philadelphia.

United States romano pisciotti manager
United States in disarmament

 

 

Romano Pisciotti, surfing web

Romano Pisciotti manager oil gas marine hose
Captain, Romano Pisciotti

The first cargo ships passed through Egypt’s New Suez Canal

The first cargo ships passed through Egypt’s New Suez Canal on Saturday in a test-run before it opens next month, state media reported, 11 months after the army began constructing the $8 billion canal alongside the existing 145-year-old Suez Canal.

new suez canal
new suez canal

The new waterway, which President Abdel Fattah al-Sisi hopes will help expand trade along the fastest shipping route between Europe and Asia and give a boost to Egypt’s economy, will be formally inaugurated on Aug. 6.

Sisi wants the canal to become a symbol of national pride and to help combat Egypt’s double-digit unemployment. The old Suez Canal is already a vital source of hard currency for Egypt, which has seen tourism and foreign investment drain away in the years of turmoil since a 2011 uprising.

Three container ships crossed the new waterway, state news agency MENA reported. One was an American ship heading to Egypt’s Port Said from Saudi Arabia, another was a Danish ship sailing to the United States from Singapore, and a Bahraini ship going to Italy from Saudi Arabia.

The exercise took place amid tight security. An insurgency based in the Sinai Peninsula, which borders on the Suez Canal, has killed hundreds of soldiers and police since 2013. State television said there were helicopters circling above and showed naval vessels escorting the ships.

Mohab Mameesh, the chairman of the Suez Canal Authority who led the project, told state television from aboard the first ship that the test-run had been a success.

“This is the first trial crossing but it will be followed by more trials,” he said. “We are 99.2 percent done with everything. We should be completely done in two or three days.”

The existing canal earns Egypt around $5 billion per year. The new canal, which will allow two-way traffic of larger ships, is supposed to increase revenues by 2023 to $15 billion.

It should also reduce navigation time for ships to 11 hours from about 22 hours, Mameesh said last month, making it the fastest such waterway in the world.

The government also plans to build an international industrial and logistics hub nearby that it hopes will eventually make up about a third of the Egyptian economy. (Reporting by Omar Fahmy and Yusri Mohamed; Writing by Ahmed Aboulenein; Editing by Raissa Kasolowsky)

Jul 25, 2015

 

Romano Pisciotti surfing web